SMB Validation

What is “Discontinuation of Inspection Rule”?

For ANSI/ASQ Z1.4-2003 and ISO 2859-1. If the cumulative number of lots not accepted in a sequence of consecutive lots on original tightened inspection reaches 5, the acceptance procedures of this part of ISO 2859 shall not be resumed until action has been taken by the supplier to improve the quality of the submitted product or service, and the responsible authority has agreed that this action is likely to be effective. Tightened inspection shall then be used.

For MIL-STD-105E, In the event that 10 consecutive lots or batches remain on tightened inspection (or such other number as may be designated by the responsible authority) inspection should be discontinued pending action to improve the quality of submitted material.